TDP-2-200 at international eco-forum in Saint Petersburg
EXPOFORUM Convention and Exhibition Centre will hold The Ecology of Big City International Forum on March 18-20, 2015. New modification of IPEC waste management equipment will be presented at company’s booth.
Thermal Decomposition Plant was manufactured as a solution in the field of environmental protection for the treatment of hydrocarbon waste streams: oil and drilling sludge, rubber and tires. TDP-2-200 main identifying features in comparison with previous modification are productive capacity and boundary dimensions. The plant is capable to process up to 300 kg of waste per hour on continuous mode. The pyrolysis plant is assembled within steel frame of the size of 20’ ft. standard sea container.
The entire process including waste feeding if fully automated and often does not require personnel involvement, resulting in enhanced safety features and productivity.
IPEC specialists will inform you about operational advantages of the pyrolytic plant at the following address: St. Petersburg, Peterburgskoe shosse 64/1, CEC Expoforum, Hall H (№3), booth C1.1 ( Safe Technologies Industrial Group).
Online registration is here.