International documentation
CONTINUOUS PYROLYSIS PLANTS
Waste treatment and utilisation
Russia, St. Petersburg,
Arsenalnaya street, 66B,
view map
+7 (812) 339-04-58
request a call
08.04.2019
Increase in Productivity of the Drilling Waste Treatment Plant at the Facility of Slavneft-Krasnoyarskneftegaz
The active development and operation of the Kuyumbinskoye oil and gas condensate field is accompanied ...
01.04.2019
Disposal and Recycling of Sewage Sludge: Drying and Pyrolysis at TDP-2
Today almost a third of the world’s population is experiencing a shortage of such a ...
22.02.2019
TDP Eurasian patent
Eurasian patent is for the plant designed for the organic raw materials pyrolysis processing. The ...
04.02.2019
Upgraded TDP-2-200 for Gazpromneft-Yamal
Pyrolysis unit TDP-2-200 for Gazpromneft-Yamal was shipped from the IPEC production site. The unit is ...
21.12.2018
Happy New Year and Merry Christmas!
Dear visitors of the IPEC website! Happy New Year and Merry Christmas! …
18.10.2018
Automobile Shredder Residue (ASR) Pyrolysis: Successful Pilot Run in Switzerland
Pilot run of TDP-2-200 continuous pyrolysis plant was successfully completed at the production site of ...
06.08.2018
Continuous pyrolysis plant TDP-2-200 for Gazpromneft-Yamal
A new contract for the delivery of a TDP-2-200 pyrolysis plant for Gazpromneft-Yamal has been ...
06.07.2018
Modernization of the drilling waste unit at the oil-gas field of NGK Slavneft goes on
Drilling waste of the Kuyumba oil-gas field developed by NGK Slavneft are successfully utilized on ...
19.06.2018
The TDP-2-200 plant passed startup tests in Switzerland
The first startup of the streamlined TDP-2-200 pyrolysis plant at the premises of Wiederkehr Recycling ...

Request a call

Your title

Phone

Preferable hours of contacting you?

Write to us

[contact-form-7 404 "Not Found"]