News
28.06.2017
The BT-Promotkhody success made possible prolongation of the contract with OAO NGK Slavneft in 2017. Aside ...
17.05.2017
The complex based on two pyrolysis units TDP-2-2000, with a capacity of at least 1500 ...
13.04.2017
17th International Exhibition ‘NEFTEGAZ-2017’ will be held on April 17-20 in the Central Exhibition Complex ...
27.02.2017
IPEC Company shipped Thermal Decomposition Plant TDP-1-1000 on the territory of the Uvat group of ...
31.01.2017
Pyrolysis plant TDP-1, manufactured by special order of JSC Apatit, was shipped from IPEC production ...
15.01.2017
[…] Engineering solutions of power generation from waste are available today. Industrial Complex of continuous ...
12.01.2017
BT-Promotkhody service company closed its obligations in 2016 under the contract with OJSC NGK Slavneft ...
09.01.2017
Recall that in mid-December 2016 Pipe Thermal Cleaning Plant (TCP) was successfully put into operation ...
23.12.2016
International certificate of compliance with the requirements of the Directive 2006/42/EC on essential health and ...
