International documentation
CONTINUOUS PYROLYSIS PLANTS
Waste treatment and utilisation
Russia, St. Petersburg,
Arsenalnaya street, 66B,
view map
+7 (812) 339-04-58
request a call

TDP-2-800 plant for drilling waste processing at Kuyumbinskoye oil field: contractual obligations 2016 fulfilled! (VIDEO!)


12.01.2017

BT-Promotkhody service company closed its obligations in 2016 under the contract with OJSC NGK Slavneft by having processed 11 600 tons of oily waste (drill cuttings) directly at the production site. Let us recall, that the main production facility is pyrolysis plant TDP-2-800 of IPEC manufacture.

The processing of waste directly at the production site and applying high-capacity plant of TDP-2 model will bring to pit-free drilling transition as there would be no need in depositing the oil sludge.

BT-Promotkhody started its contract activity at the end of April, 2016. As a result of drilling waste processing at Kuyumbinskoye field, the following output products were derived:

Thus, TDP-2-800 pyrolysis plants are capable of obtaining the valuable products from the drilling waste. No additional waste is generated during the operating process and after the process stabilization.

Request a call

Your title

Phone

Preferable hours of contacting you?

Write to us

[contact-form-7 404 "Not Found"]