International documentation
CONTINUOUS PYROLYSIS PLANTS
Waste treatment and utilization
Russia, St. Petersburg,
Arsenalnaya street, 66B,
view map
+7 (812) 339-04-58
request a call

Enhancement of the TDP-2-800 pyrolysis unit: new delivery scope for Slavneft-Krasnoyarskneftegaz


04.03.2020

An equipment package has been sent to the Kuyumbinskoye oil and gas field, developed by Slavneft-Krasnoyarskneftegaz, for the updating of the TDP-2-800 pyrolysis unit processing drill cuttings.

  Drilling waste loading system for TDP-2-800 Condensation system of waste processing unit TDP-2

The plant will be equipped with an optional pyrolysis gas filter and heat exchanger. A back-up line for the filtration and condensation of pyrolysis gases will provide less frequent shutdown of the reactor for maintenance. This up-to-date solution has already been implemented at three other IPEC plants, also operated at the Kuyumbinsky oil and gas condensate field.

The delivery set also included more powerful air cooler and an enhanced ash unloading system, including upgraded conveyors, a new reactor with auger system and a loading conveyor housing, which will replace used equipment.

Recall that BT-Promotkhody LLC has been providing services for the treatment of waste generated at the Kuyumbinsky license area of Slavneft-Krasnoyarskneftegaz since 2016. The equipment manufactured by IPEC (Safe Technologies IG) has proven itself for the processing of drill cuttings.

Request a call

    Your title

    Phone

    Preferable hours of contacting you?

    By clicking SEND you agree to the Privacy Policy

    Write to us

    Error: Contact form not found.