PJSC Gazprom Neft (JSC Messoyakhaneftegaz)
                    
                         Yamal-Nenets Autonomous Okrug                    
                Delivered equipment:
- Continuous Thermal Decomposition Plant (TDP-2-800)
 
                 Project phase
            
            
                Commissioning 
Waste: oil sludge, oil-contaminated frozen soils, sludge from sewage treatment plants
        Waste: oil sludge, oil-contaminated frozen soils, sludge from sewage treatment plants
News
                04.02.2023
        
            At the beginning of February at Ukhta State Technical University...        
    
                25.09.2022
        
            A set of equipment for the oil sludge processing plant,...        
    
                05.08.2022
        
            The upgraded pyrolysis reactor of the TDP-2 high-capacity furnace manufactured...        
    