International documentation
CONTINUOUS PYROLYSIS PLANTS
Waste treatment and utilisation
Russia, St. Petersburg,
Arsenalnaya street, 66B,
view map
+7 (812) 339-04-58
request a call

OOO Gazpromneft-Yamal

Yamalo-Nenets Autonomous District

Delivered equipment:

  • Continuous Thermal Decomposition Plant (TDP-2-200)
Project phase
TDP-2-200 shipped to the site

News

21.10.2019
TDP-1 pyrolysis unit will process waste from the Urnenskoye field of PJSC Rosneft
The pyrolysis plant TDP-1-1000 with the capacity of up to...
22.08.2019
Installation of oil sludge processing plant TDP-2-800 is completed at Gazprom Neft PJSC
The installation supervision of TDP-2-800 pyrolysis furnace mounted at the...
08.04.2019
Increase in Productivity of the Drilling Waste Treatment Plant at the Facility of Slavneft-Krasnoyarskneftegaz
The active development and operation of the Kuyumbinskoye oil and...

Request a call

Your title

Phone

Preferable hours of contacting you?

Write to us

[contact-form-7 404 "Not Found"]