PJSC Gazprom Neft (JSC Messoyakhaneftegaz)

Yamal-Nenets Autonomous Okrug
Delivered equipment:
- Continuous Thermal Decomposition Plant (TDP-2-800)
Project phase
Commissioning
Waste: oil sludge, oil-contaminated frozen soils, sludge from sewage treatment plants
Waste: oil sludge, oil-contaminated frozen soils, sludge from sewage treatment plants
News

14.07.2020
[…] Plastics are an amazing group of materials with a...

04.03.2020
An equipment package has been sent to the Kuyumbinskoye oil...