PJSC Rosneft Oil Company

Tyumen Region
Delivered equipment:
- Thermal Decomposition Plant TDP-1-1000
Project phase
The facility has been put into operation
Waste: oil sludge, oil-contaminated soils and sand, waste oil, dornite, waste rubber products
Waste: oil sludge, oil-contaminated soils and sand, waste oil, dornite, waste rubber products
News

25.09.2022
A set of equipment for the oil sludge processing plant,...

05.08.2022
The upgraded pyrolysis reactor of the TDP-2 high-capacity furnace manufactured...

29.10.2021
[…] Every second, for example, as you read this article,...