Waste management company
Central Federal District (CFD), Russia
Delivered equipment:
- Continuous Thermal Decomposition Plant (TDP-2-800)
Project phase
The facility was in operation during the period 2016-2021. In connection with the elimination of the full volume of accumulated waste, the organization changed its activity.
News
04.02.2023
At the beginning of February at Ukhta State Technical University...
25.09.2022
A set of equipment for the oil sludge processing plant,...
05.08.2022
The upgraded pyrolysis reactor of the TDP-2 high-capacity furnace manufactured...